Production process

How custom production works

What happens between your first enquiry and opening the delivered cartons: eleven stages, who handles each one and what needs approval before the next step.

The question is often more practical than the price: what actually happens if I order today? Answering it properly means recognising that the schedule includes your decisions and artwork approvals as well as workshop time.

A custom order is a manufacturing project rather than a stock pick. Specifications, files, proofs and inspection documents pass between the people involved. Delays can occur between those handovers as well as during production, so each stage needs a clear owner and an agreed output.

Use this as a planning framework, not a guaranteed calendar for every order.

The full sequence at a glance. The eleven stages below explain the decisions from first brief to delivery; the actual dates are confirmed for your project.
STAGE 1

The brief: six details needed to assess the project

Missing information has to be clarified before the workshop can price and schedule the work reliably.

  1. The product and how it will be used. For packaging, describe the actual contents, who handles the pack and the intended market. Different contents can require different materials and production routes.
  2. Your intended quantity and a useful comparison quantity. Comparing 500 and 1,000 pieces, for example, can clarify the effect of setup and unit production costs.
  3. Dimensions or capacity. Approximate dimensions are useful at the enquiry stage. A net weight alone does not establish volume without knowing the contents and density.
  4. The state of your artwork. Tell us whether the logo is vector-based and whether colour references are defined. File preparation may take longer when the artwork needs rebuilding.
  5. Your real deadline. Give the date the goods must reach you. We assess the full route before agreeing whether that date is feasible.
  6. The delivery location. Country, postcode and access details matter. Include unloading arrangements, receiving times and any site restrictions so transport can be quoted accurately.
How a complete enquiry becomes a project quotation

Why an incomplete brief takes longer. Allow time for clarifications and replies. Communication between your market and the workshop may cross time zones. A clear first brief avoids repeated questions and gives the team a better basis for quoting.

A short message covering all six points is more useful than a long presentation that omits quantity, dimensions or destination. We clarify the gaps before confirming the offer; no response statistic is implied by this example.

STAGE 2

The quotation: what it covers and what still needs approval

We aim to respond within 48 working hours after a complete brief. The quotation states its validity, currency and scope, normally with DAP transport quoted separately from destination import charges. Read the specification and shipping terms together before committing.

Quotation itemWhat to confirmWhat may require a revised quote
Unit price at each quantityValidity stated in the offerMaterial costs, quantity or exchange-rate conditions
Tooling costThe agreed tooling specificationChanges to dimensions, artwork or production process
Quoted transport and shipping termsIncluded route and services; destination charges identifiedFreight availability, seasonal surcharges or delivery changes
Minimum per design or referenceThe agreed tooling specificationConfirm against the selected specification
Production scheduleProvisional until the required approvals and bookingWorkshop capacity, materials and holiday closures
Material and constructionThe agreed tooling specificationAny proposed substitution requires review before approval

A quotation prices the described construction, quantity and agreed transport scope. It does not, by itself, reserve a production slot : capacity is booked under the order and payment conditions in the offer. It also does not approve your artwork : text, layout and colours need the agreed proof. And it does not replace the technical template : dimensions and manufacturing constraints still need to be fixed before the artwork and tooling are approved.

Variables to keep in view. Material costs, exchange rates and freight can change. The offer defines its validity and currency; an expired quote or a changed specification may need recalculating. Ask for confirmation rather than assuming an old price still applies.

The sequence

Eleven production stages, each with a defined output

The stage labels show the order of work, not cumulative delivery promises. Approval and file preparation can take a substantial part of the overall schedule before a machine starts.

01

Project brief

Output : a complete project specification. Owner : you, with clarification from the project team. Possible hold : one of the six required details is missing.

02

Quotation

Output : the offer, quantity comparisons, shipping scope and validity. Owner : your project contact. Possible hold : the product or destination is not sufficiently defined.

03

Order confirmation and deposit

Output : an agreed order and the required payment confirmation. Owner : you, with clarification from the project team. Possible hold : payment processing or missing order information.

04

Technical template

Output : a dimensioned vector template with bleed and relevant seal or fold areas. Owner : workshop prepress, coordinated by the project team. Possible hold : the format is still changing.

05

Print-ready artwork

Output : a print file built on the approved template. Owner : your designer, with prepress review. Possible hold : artwork corrections, missing fonts or unresolved text.

06

Digital proof approval

Output : an approved PDF at the agreed scale and specification. Owner : you, with clarification from the project team. Possible hold : several reviewers without one final approver.

07

Tooling

Output : the required cutting die, cylinders, screens or mould. Owner : the partner workshop. Possible hold : a requested change after tooling has been made.

08

Production

Output : the run and the agreed first-off production check. Owner : the partner workshop. Possible hold : material availability, workshop capacity or closures.

09

Quality inspection

Output : the agreed inspection record and photographs before dispatch. Owner : the production coordination team and workshop. Possible hold : sorting or corrective work following an identified issue.

10

Packing and dispatch

Output : labelled cartons, agreed pallets and a packing list. Owner : the workshop and freight provider. Possible hold : carton quantities or receiving requirements are not defined.

11 · route-specific timing

Delivery and receiving checks

Output : goods and the applicable shipment documents at the agreed destination. Owner : the freight provider and your receiving team. Possible hold : access restrictions or customs requirements were not anticipated.

StageActionOutputResponsible partyCommon point to clarify
01BriefProject specificationYou and the project contactA required detail is missing
02QuoteOffer with validity and shipping scopeProject contactProduct not fully described
03OrderRequired deposit confirmedYou and the project contactPayment processing and order confirmation
04TemplateDimensioned vector layoutWorkshop prepressFormat not yet fixed
05ArtworkAccepted print fileYour designerFile corrections not yet approved
06Digital proofApproved PDFYou and the project contactNo final approver identified
07ToolingCutting die, cylinders or mouldPartner workshopChange after tooling
08ProductionRun and first-off checkPartner workshopMaterials, capacity or holiday closures
09InspectionInspection record and photographsProduction coordination teamSorting or corrective work
10DispatchPacking specification and packing listWorkshop and freight providerPacking not yet defined
Route-specificReceiptGoods and shipment documentsFreight provider, then receiving teamSite cannot accept the shipment as planned

The production clock does not start at your first enquiry. It starts after the required proof approval and order conditions have been met. Brief, payment, artwork and approval are shared dependencies; the agreed project schedule should show them separately from manufacturing and freight.

Template and artwork

The handover that prevents avoidable file corrections

A conforming file can move to the next approval stage. An approximate layout must be corrected first, so define the template before finalising the artwork.

What an accepted print file contains, and the issues that require correction

The workshop template comes first: actual dimensions, bleed, seals and folds. The artwork is built inside that layout. A design made without the technical constraints may need rebuilding, especially if it has been flattened and individual elements cannot be edited.

Allow for review and correction rounds before approval. The number depends on the file and the product; an unsupported average is not a promise of a fixed approval time.

  1. RGB files or low-resolution images. Use the colour space and resolution requested by prepress, normally CMYK and around 300 dpi at final size for raster print artwork. Name spot colours clearly and confirm the actual print requirements with the template.
  2. Fonts that are not embedded or outlined as requested. A substituted font can change layout and line breaks. Check the proof carefully and follow the file instructions rather than assuming the workshop has your fonts.
  3. Important artwork too close to an edge, fold or seal. Bleed and safe areas are product-specific. Source layouts commonly allow several millimetres, but the approved template—not a universal figure—defines the requirements for the actual order.

A practical way to reduce waiting. Ask for the correct template early so your designer can prepare the file while the other order details are confirmed. Supply usable barcode artwork and discuss its size, contrast and substrate with prepress; confirm scanning performance where it matters rather than relying on a generic percentage.

Proof approval

Digital and physical proofs do different jobs

One is reviewed on screen, the other in hand. Decide what each approval needs to establish before production.

ActionTimingCost basisWhat it checksWhat it does not establish
Digital proofAfter the print file is accepted; timing confirmedConfirm in the quoteText, dimensions, layout, artwork references and agreed production informationActual surface colour, feel or long-term performance
Physical sampleAllow approximately 10–15 days, subject to the sample and routeSample and freight charges agreed in advanceActual material, colour under appropriate lighting, construction and filled appearanceUniformity across the whole production run
First-off production sampleDuring production setupConfirm in the quoteThe actual production output against the approved referenceContinued checks are still needed across the run

The digital proof is a PDF built on the agreed template at the specified scale. Check spelling, layout, dimensions, required wording, colour references and any recorded packing details. An independent read-through can catch errors that the original author overlooks.

A screen emits light while the printed substrate reflects it, so a PDF cannot establish the actual colour or feel. A physical sample can show material, finish, construction and the appearance when filled. Confirm whether the sample uses the actual production method or is a separate mock-up.

When a change becomes costly. Making the tooling is a key point. A revision before tooling may need another file and proof review; afterwards it can require replacement tooling and a new schedule. Ask for written approval before any additional charge or rework proceeds.

A physical sample takes time and has an agreed cost. Any credit against a later production run must be stated in the offer.

Tooling and production

Setup, first-off approval and checks during the run

Tooling can make a first order longer and more expensive than a repeat run. Confirm its specification, charge, ownership, storage and reuse conditions in the project documents.

ToolingWhen it may be neededTiming to confirmReuse conditions
Cutting dieCartons, sleeves, presentation boxes or custom-cut labelsProject-specific setup timeWhere the tool is suitable and retained
Gravure cylindersCertain larger flexible-packaging runs; process and colour count to confirmProject-specific setup timeWhere design, condition and process are unchanged
Screen-printing screensClothing, tote bags and suitable objectsProject-specific setup timeFor an unchanged suitable design
Foil-stamping or embossing dieHot foil and relief finishesProject-specific setup timeWhere the tool remains suitable
Injection or blow mouldA custom-shaped plastic componentProject-specific tooling scheduleConfirm the material, machine and reuse conditions
No dedicated toolingCertain digital processes, short runs or standard formatsConfirm setup requirementsNot applicable where no dedicated tool is made
Pre-dispatch checks cover the agreed dimensions, appearance, function and packing.

Production starts with setup and an initial output. The agreedfirst-off sampleis compared with the approved reference, including colour, dimensions and relevant functional points, before continuing the run.

Checks during the run look for drift: colour changes, registration movement, sealing differences or other product-specific issues. Agree the sampling frequency and tolerances for the job rather than assuming every order uses the same interval.

Production takes the period agreed for the chosen product after approval. This includes the sequence of setup, printing, drying, cutting and finishing where applicable. It is followed by the agreed inspection stage before dispatch, while corrective work can still be assessed with the workshop.

Packing and dispatch

Define cartons, packing quantities and the shipment

The receiving condition depends on packing as well as manufacturing. Agree it early instead of leaving the workshop to choose a default.

Too much empty space can allow movement; overfilling can damage the goods or carton. Set the number of units, protective packing, carton construction and pallet dimensions to suit the product and destination.

Handling and fulfilment needs matter. Specify acceptable carton weight, inner-pack quantities and any retailer requirements. Agree these before quoting so packing costs and receiving arrangements can be included.

Shipment documents may include the invoice, packing list, transport documents and applicable material or test records.
DecisionWho confirms itWhen to agree itRisk if left unclear
Units per cartonYou with the workshopDuring quotationA default carton quantity may not fit your receiving or fulfilment process
Individual packingYou and the project contactDuring quotationGoods may otherwise arrive loose inside an outer carton
Carton labelsSKLUBSBefore packingReferences may not match your receiving requirements
Pallet dimensions and heightFreight provider with your receiving requirementsBefore dispatchPallets may not fit the vehicle or receiving equipment
Transport modeYou, after the proposed optionsBefore the order is committedCost or timing may not fit your priorities
Customs classificationSKLUBSBefore shipmentCharges or clearance requirements may be assessed incorrectly

International air freight takes a route-specific period confirmed in the quote and may use chargeable weight based on actual or volumetric weight. Sea freight takes a separately quoted period and its charging basis depends on the service. Compare the complete route, volume, weight, handling and destination costs before choosing; no universal quantity or worldwide transit time decides the answer.

Customs and DAP responsibilities. The offer records the agreed transport and service scope. On the normal international DAP route, destination import clearance, duties and import taxes need to be assigned and priced appropriately; they are not automatically included in the production quote. Confirm the receiving party and documents before payment.

Quantities and schedule

Working reference points for the project plan

Use the chosen product specification and destination. Each time estimate should say what stage it covers and which shipping terms apply.

48 working hourstarget quotation response after a complete brief
By productminimum quantity confirmed per product
250pieces: starting minimum for flexible laminated packaging
Approximately 10–15 daysfor a sample, subject to its method and agreed route
By productproduction after proof approval, as quoted
Before dispatchinspection to the agreed plan
By destinationtransport quoted before payment; DAP import charges separate
Project-specificoverall schedule includes approval, production, checks and transport

The production schedule starts from the agreed proof approvaland required order conditions, not simply the first enquiry. File preparation, any sample and the approval itself need their own time in the calendar.

Give an essential deadline in the first message. We can plan backwards from it and identify when the artwork and approvals are needed. If the route is not feasible, that should be clear before an order is committed.

When the shipment arrives

Receiving checks and the records useful for a repeat order

Check the shipment promptly and follow the carrier’s and order’s applicable reporting procedures. Keep the approved proof and production documents available for comparison.

  1. At delivery, count the packages against the packing list and check for visible crushing, torn wrapping or moisture. Record specific issues on the appropriate documents and retain photographs; the relevant reporting procedure depends on the carrier and shipment terms.
  2. Promptly after receipt, inspect representative cartons from different parts of the shipment and compare the goods with the approved proof and any reference sample.
  3. During the receiving check, verify quantities, barcode scanning where relevant and the intended function: closures, assembly or use. The sampling plan depends on the product and run.
  4. If you find a discrepancy, describe it precisely, identify the affected packages and goods, keep evidence and contact the project team and carrier under the applicable deadlines. Do not rely on a generic reservation or assume one legal reporting period applies worldwide.
Retained tooling can reduce setup work on a repeat order, where its specification and condition remain suitable. Request a fresh price for the actual quantity and materials.

How the project team follows up. An issue is reviewed against the approved specification, sample and inspection record. The appropriate response may include sorting, rework, remanufacture or an agreed commercial remedy, subject to the order terms.

Record or assetWhere it is heldWhat it can simplify on a repeat order
Cutting die, cylinders, screens or mouldAt the workshop, linked to the projectTooling setup, where the existing tool remains suitable
Dimensioned vector layoutIn the project fileTemplate preparation and reference checks
Accepted print fileIn the project file and with the authorised workshopFile preparation where the specification is unchanged
Approved proof and reference sampleDated in the project recordA reference for appearance and any discrepancy review
Packing specification and customs informationIn the project fileRepeat packing and shipment preparation
Material and supplier referencesIn the project fileChecking consistency between the new and earlier runs

An unchanged repeat order may reuse the template, print file, suitable tooling and approved references, reducing preparation work by a project-specific amount. Changes to format, artwork, material or process can reopen approval or tooling stages. Do not assume every repeat order can bypass sampling or retain the same price.

Frequently asked questions

Questions about the production sequence

If I enquire today, when can the goods arrive?

The date depends on the product, artwork readiness, any sample, workshop capacity, inspection and transport to your destination. We confirm those stages in a project schedule rather than promise a universal arrival date from the enquiry.

Six details: product and use, quantity with a useful comparison quantity, dimensions or capacity, artwork status, target date and delivery address. Missing information needs clarifying before a reliable quote and schedule can be confirmed.

The offer states its validity. Material costs, exchange rates, freight or a changed specification may require an updated price after that period; ask for a current confirmation before placing the order.

Not by itself. The order, required payment and workshop booking conditions establish the production arrangement. Capacity and holiday closures must be checked rather than assumed from an earlier quote.

The technical layout is prepared with workshop prepress for the chosen product. Ask for it early so the designer can use the correct dimensions, bleed, seal and fold areas. Timing and any charges are confirmed for the project.

Allow time for review, but no fixed average is promised. Common issues include the wrong colour space, low-resolution images, unavailable fonts and important details too close to an edge or seal. A complete file built on the right template reduces corrections.

It can be important for a first run or critical material, colour or construction requirement. Confirm whether it uses the production process, what it proves, its charge, delivery and any credit against the series. An unchanged repeat may have different sampling needs, to be reviewed rather than assumed.

Once tooling has been made, changes to the artwork, dimensions or process may require replacement tools and a revised schedule. Before that point, changes can still need another file or proof review. Confirm the cost and approval before proceeding.

Count packages, check the outside condition, compare representative goods with the approved reference, verify quantities and relevant functions, and retain evidence of any discrepancy. Follow the specific carrier and order reporting requirements; deadlines vary with the shipment and destination.

Suitable retained tooling, files and approval records can reduce preparation. The new quote still confirms quantity, materials, price, tool condition, inspection and transport. A changed design or construction may reopen stages from the first order.

Prepare the specification

Explore options before requesting the final quotation

Specification tools can help you describe: pouches and doypacks, stickers and labels, jars and bottles, clothing, tote bags, pins and badges and business cards.

The available tools are grouped on the product specification tools page. Custom-shaped boxes, presentation cases and displays need a project quotation.

Start your project

Send the six key details so we can prepare a quote and project schedule.

Product, quantity, dimensions, artwork status, deadline and address. After a complete brief we aim to respond within 48 working hours, confirming production, destination-specific transport and the approvals needed before your target date.

Response target: 48 working hoursTechnical template for the chosen specificationInspection before dispatchDAP transport quoted before payment

Delivery to the United Arab Emirates

Include the emirate, complete delivery address and required date. Transport is quoted before payment, normally on DAP terms; import duties and import taxes payable at destination are separate. Discuss any Arabic and English artwork in the brief and approve the supplied text before production.