How custom production works
What happens between your first enquiry and opening the delivered cartons: eleven stages, who handles each one and what needs approval before the next step.
The question is often more practical than the price: what actually happens if I order today? Answering it properly means recognising that the schedule includes your decisions and artwork approvals as well as workshop time.
A custom order is a manufacturing project rather than a stock pick. Specifications, files, proofs and inspection documents pass between the people involved. Delays can occur between those handovers as well as during production, so each stage needs a clear owner and an agreed output.
Use this as a planning framework, not a guaranteed calendar for every order.
The brief: six details needed to assess the project
Missing information has to be clarified before the workshop can price and schedule the work reliably.
- The product and how it will be used. For packaging, describe the actual contents, who handles the pack and the intended market. Different contents can require different materials and production routes.
- Your intended quantity and a useful comparison quantity. Comparing 500 and 1,000 pieces, for example, can clarify the effect of setup and unit production costs.
- Dimensions or capacity. Approximate dimensions are useful at the enquiry stage. A net weight alone does not establish volume without knowing the contents and density.
- The state of your artwork. Tell us whether the logo is vector-based and whether colour references are defined. File preparation may take longer when the artwork needs rebuilding.
- Your real deadline. Give the date the goods must reach you. We assess the full route before agreeing whether that date is feasible.
- The delivery location. Country, postcode and access details matter. Include unloading arrangements, receiving times and any site restrictions so transport can be quoted accurately.
Why an incomplete brief takes longer. Allow time for clarifications and replies. Communication between your market and the workshop may cross time zones. A clear first brief avoids repeated questions and gives the team a better basis for quoting.
A short message covering all six points is more useful than a long presentation that omits quantity, dimensions or destination. We clarify the gaps before confirming the offer; no response statistic is implied by this example.
The quotation: what it covers and what still needs approval
We aim to respond within 48 working hours after a complete brief. The quotation states its validity, currency and scope, normally with DAP transport quoted separately from destination import charges. Read the specification and shipping terms together before committing.
| Quotation item | What to confirm | What may require a revised quote |
|---|---|---|
| Unit price at each quantity | Validity stated in the offer | Material costs, quantity or exchange-rate conditions |
| Tooling cost | The agreed tooling specification | Changes to dimensions, artwork or production process |
| Quoted transport and shipping terms | Included route and services; destination charges identified | Freight availability, seasonal surcharges or delivery changes |
| Minimum per design or reference | The agreed tooling specification | Confirm against the selected specification |
| Production schedule | Provisional until the required approvals and booking | Workshop capacity, materials and holiday closures |
| Material and construction | The agreed tooling specification | Any proposed substitution requires review before approval |
A quotation prices the described construction, quantity and agreed transport scope. It does not, by itself, reserve a production slot : capacity is booked under the order and payment conditions in the offer. It also does not approve your artwork : text, layout and colours need the agreed proof. And it does not replace the technical template : dimensions and manufacturing constraints still need to be fixed before the artwork and tooling are approved.
Variables to keep in view. Material costs, exchange rates and freight can change. The offer defines its validity and currency; an expired quote or a changed specification may need recalculating. Ask for confirmation rather than assuming an old price still applies.
Eleven production stages, each with a defined output
The stage labels show the order of work, not cumulative delivery promises. Approval and file preparation can take a substantial part of the overall schedule before a machine starts.
01
Project brief
Output : a complete project specification. Owner : you, with clarification from the project team. Possible hold : one of the six required details is missing.
02
Quotation
Output : the offer, quantity comparisons, shipping scope and validity. Owner : your project contact. Possible hold : the product or destination is not sufficiently defined.
03
Order confirmation and deposit
Output : an agreed order and the required payment confirmation. Owner : you, with clarification from the project team. Possible hold : payment processing or missing order information.
04
Technical template
Output : a dimensioned vector template with bleed and relevant seal or fold areas. Owner : workshop prepress, coordinated by the project team. Possible hold : the format is still changing.
05
Print-ready artwork
Output : a print file built on the approved template. Owner : your designer, with prepress review. Possible hold : artwork corrections, missing fonts or unresolved text.
06
Digital proof approval
Output : an approved PDF at the agreed scale and specification. Owner : you, with clarification from the project team. Possible hold : several reviewers without one final approver.
07
Tooling
Output : the required cutting die, cylinders, screens or mould. Owner : the partner workshop. Possible hold : a requested change after tooling has been made.
08
Production
Output : the run and the agreed first-off production check. Owner : the partner workshop. Possible hold : material availability, workshop capacity or closures.
09
Quality inspection
Output : the agreed inspection record and photographs before dispatch. Owner : the production coordination team and workshop. Possible hold : sorting or corrective work following an identified issue.
10
Packing and dispatch
Output : labelled cartons, agreed pallets and a packing list. Owner : the workshop and freight provider. Possible hold : carton quantities or receiving requirements are not defined.
11 · route-specific timing
Delivery and receiving checks
Output : goods and the applicable shipment documents at the agreed destination. Owner : the freight provider and your receiving team. Possible hold : access restrictions or customs requirements were not anticipated.
| Stage | Action | Output | Responsible party | Common point to clarify |
|---|---|---|---|---|
| 01 | Brief | Project specification | You and the project contact | A required detail is missing |
| 02 | Quote | Offer with validity and shipping scope | Project contact | Product not fully described |
| 03 | Order | Required deposit confirmed | You and the project contact | Payment processing and order confirmation |
| 04 | Template | Dimensioned vector layout | Workshop prepress | Format not yet fixed |
| 05 | Artwork | Accepted print file | Your designer | File corrections not yet approved |
| 06 | Digital proof | Approved PDF | You and the project contact | No final approver identified |
| 07 | Tooling | Cutting die, cylinders or mould | Partner workshop | Change after tooling |
| 08 | Production | Run and first-off check | Partner workshop | Materials, capacity or holiday closures |
| 09 | Inspection | Inspection record and photographs | Production coordination team | Sorting or corrective work |
| 10 | Dispatch | Packing specification and packing list | Workshop and freight provider | Packing not yet defined |
| Route-specific | Receipt | Goods and shipment documents | Freight provider, then receiving team | Site cannot accept the shipment as planned |
The production clock does not start at your first enquiry. It starts after the required proof approval and order conditions have been met. Brief, payment, artwork and approval are shared dependencies; the agreed project schedule should show them separately from manufacturing and freight.
The handover that prevents avoidable file corrections
A conforming file can move to the next approval stage. An approximate layout must be corrected first, so define the template before finalising the artwork.
The workshop template comes first: actual dimensions, bleed, seals and folds. The artwork is built inside that layout. A design made without the technical constraints may need rebuilding, especially if it has been flattened and individual elements cannot be edited.
Allow for review and correction rounds before approval. The number depends on the file and the product; an unsupported average is not a promise of a fixed approval time.
- RGB files or low-resolution images. Use the colour space and resolution requested by prepress, normally CMYK and around 300 dpi at final size for raster print artwork. Name spot colours clearly and confirm the actual print requirements with the template.
- Fonts that are not embedded or outlined as requested. A substituted font can change layout and line breaks. Check the proof carefully and follow the file instructions rather than assuming the workshop has your fonts.
- Important artwork too close to an edge, fold or seal. Bleed and safe areas are product-specific. Source layouts commonly allow several millimetres, but the approved template—not a universal figure—defines the requirements for the actual order.
A practical way to reduce waiting. Ask for the correct template early so your designer can prepare the file while the other order details are confirmed. Supply usable barcode artwork and discuss its size, contrast and substrate with prepress; confirm scanning performance where it matters rather than relying on a generic percentage.
Digital and physical proofs do different jobs
One is reviewed on screen, the other in hand. Decide what each approval needs to establish before production.
| Action | Timing | Cost basis | What it checks | What it does not establish |
|---|---|---|---|---|
| Digital proof | After the print file is accepted; timing confirmed | Confirm in the quote | Text, dimensions, layout, artwork references and agreed production information | Actual surface colour, feel or long-term performance |
| Physical sample | Allow approximately 10–15 days, subject to the sample and route | Sample and freight charges agreed in advance | Actual material, colour under appropriate lighting, construction and filled appearance | Uniformity across the whole production run |
| First-off production sample | During production setup | Confirm in the quote | The actual production output against the approved reference | Continued checks are still needed across the run |
The digital proof is a PDF built on the agreed template at the specified scale. Check spelling, layout, dimensions, required wording, colour references and any recorded packing details. An independent read-through can catch errors that the original author overlooks.
A screen emits light while the printed substrate reflects it, so a PDF cannot establish the actual colour or feel. A physical sample can show material, finish, construction and the appearance when filled. Confirm whether the sample uses the actual production method or is a separate mock-up.
When a change becomes costly. Making the tooling is a key point. A revision before tooling may need another file and proof review; afterwards it can require replacement tooling and a new schedule. Ask for written approval before any additional charge or rework proceeds.
A physical sample takes time and has an agreed cost. Any credit against a later production run must be stated in the offer.
Setup, first-off approval and checks during the run
Tooling can make a first order longer and more expensive than a repeat run. Confirm its specification, charge, ownership, storage and reuse conditions in the project documents.
| Tooling | When it may be needed | Timing to confirm | Reuse conditions |
|---|---|---|---|
| Cutting die | Cartons, sleeves, presentation boxes or custom-cut labels | Project-specific setup time | Where the tool is suitable and retained |
| Gravure cylinders | Certain larger flexible-packaging runs; process and colour count to confirm | Project-specific setup time | Where design, condition and process are unchanged |
| Screen-printing screens | Clothing, tote bags and suitable objects | Project-specific setup time | For an unchanged suitable design |
| Foil-stamping or embossing die | Hot foil and relief finishes | Project-specific setup time | Where the tool remains suitable |
| Injection or blow mould | A custom-shaped plastic component | Project-specific tooling schedule | Confirm the material, machine and reuse conditions |
| No dedicated tooling | Certain digital processes, short runs or standard formats | Confirm setup requirements | Not applicable where no dedicated tool is made |
Production starts with setup and an initial output. The agreedfirst-off sampleis compared with the approved reference, including colour, dimensions and relevant functional points, before continuing the run.
Checks during the run look for drift: colour changes, registration movement, sealing differences or other product-specific issues. Agree the sampling frequency and tolerances for the job rather than assuming every order uses the same interval.
Production takes the period agreed for the chosen product after approval. This includes the sequence of setup, printing, drying, cutting and finishing where applicable. It is followed by the agreed inspection stage before dispatch, while corrective work can still be assessed with the workshop.
Define cartons, packing quantities and the shipment
The receiving condition depends on packing as well as manufacturing. Agree it early instead of leaving the workshop to choose a default.
Too much empty space can allow movement; overfilling can damage the goods or carton. Set the number of units, protective packing, carton construction and pallet dimensions to suit the product and destination.
Handling and fulfilment needs matter. Specify acceptable carton weight, inner-pack quantities and any retailer requirements. Agree these before quoting so packing costs and receiving arrangements can be included.
| Decision | Who confirms it | When to agree it | Risk if left unclear |
|---|---|---|---|
| Units per carton | You with the workshop | During quotation | A default carton quantity may not fit your receiving or fulfilment process |
| Individual packing | You and the project contact | During quotation | Goods may otherwise arrive loose inside an outer carton |
| Carton labels | SKLUBS | Before packing | References may not match your receiving requirements |
| Pallet dimensions and height | Freight provider with your receiving requirements | Before dispatch | Pallets may not fit the vehicle or receiving equipment |
| Transport mode | You, after the proposed options | Before the order is committed | Cost or timing may not fit your priorities |
| Customs classification | SKLUBS | Before shipment | Charges or clearance requirements may be assessed incorrectly |
International air freight takes a route-specific period confirmed in the quote and may use chargeable weight based on actual or volumetric weight. Sea freight takes a separately quoted period and its charging basis depends on the service. Compare the complete route, volume, weight, handling and destination costs before choosing; no universal quantity or worldwide transit time decides the answer.
Customs and DAP responsibilities. The offer records the agreed transport and service scope. On the normal international DAP route, destination import clearance, duties and import taxes need to be assigned and priced appropriately; they are not automatically included in the production quote. Confirm the receiving party and documents before payment.
Working reference points for the project plan
Use the chosen product specification and destination. Each time estimate should say what stage it covers and which shipping terms apply.
The production schedule starts from the agreed proof approvaland required order conditions, not simply the first enquiry. File preparation, any sample and the approval itself need their own time in the calendar.
Give an essential deadline in the first message. We can plan backwards from it and identify when the artwork and approvals are needed. If the route is not feasible, that should be clear before an order is committed.
Receiving checks and the records useful for a repeat order
Check the shipment promptly and follow the carrier’s and order’s applicable reporting procedures. Keep the approved proof and production documents available for comparison.
- At delivery, count the packages against the packing list and check for visible crushing, torn wrapping or moisture. Record specific issues on the appropriate documents and retain photographs; the relevant reporting procedure depends on the carrier and shipment terms.
- Promptly after receipt, inspect representative cartons from different parts of the shipment and compare the goods with the approved proof and any reference sample.
- During the receiving check, verify quantities, barcode scanning where relevant and the intended function: closures, assembly or use. The sampling plan depends on the product and run.
- If you find a discrepancy, describe it precisely, identify the affected packages and goods, keep evidence and contact the project team and carrier under the applicable deadlines. Do not rely on a generic reservation or assume one legal reporting period applies worldwide.
How the project team follows up. An issue is reviewed against the approved specification, sample and inspection record. The appropriate response may include sorting, rework, remanufacture or an agreed commercial remedy, subject to the order terms.
| Record or asset | Where it is held | What it can simplify on a repeat order |
|---|---|---|
| Cutting die, cylinders, screens or mould | At the workshop, linked to the project | Tooling setup, where the existing tool remains suitable |
| Dimensioned vector layout | In the project file | Template preparation and reference checks |
| Accepted print file | In the project file and with the authorised workshop | File preparation where the specification is unchanged |
| Approved proof and reference sample | Dated in the project record | A reference for appearance and any discrepancy review |
| Packing specification and customs information | In the project file | Repeat packing and shipment preparation |
| Material and supplier references | In the project file | Checking consistency between the new and earlier runs |
An unchanged repeat order may reuse the template, print file, suitable tooling and approved references, reducing preparation work by a project-specific amount. Changes to format, artwork, material or process can reopen approval or tooling stages. Do not assume every repeat order can bypass sampling or retain the same price.
Questions about the production sequence
If I enquire today, when can the goods arrive?
The date depends on the product, artwork readiness, any sample, workshop capacity, inspection and transport to your destination. We confirm those stages in a project schedule rather than promise a universal arrival date from the enquiry.
What information do you need to start?
Six details: product and use, quantity with a useful comparison quantity, dimensions or capacity, artwork status, target date and delivery address. Missing information needs clarifying before a reliable quote and schedule can be confirmed.
How long is my quotation valid?
The offer states its validity. Material costs, exchange rates, freight or a changed specification may require an updated price after that period; ask for a current confirmation before placing the order.
Does the quotation reserve production capacity?
Not by itself. The order, required payment and workshop booking conditions establish the production arrangement. Capacity and holiday closures must be checked rather than assumed from an earlier quote.
Who supplies the template, and when?
The technical layout is prepared with workshop prepress for the chosen product. Ask for it early so the designer can use the correct dimensions, bleed, seal and fold areas. Timing and any charges are confirmed for the project.
How many artwork review rounds should I allow?
Allow time for review, but no fixed average is promised. Common issues include the wrong colour space, low-resolution images, unavailable fonts and important details too close to an edge or seal. A complete file built on the right template reduces corrections.
Do I need a physical sample?
It can be important for a first run or critical material, colour or construction requirement. Confirm whether it uses the production process, what it proves, its charge, delivery and any credit against the series. An unchanged repeat may have different sampling needs, to be reviewed rather than assumed.
When does a design change require new tooling?
Once tooling has been made, changes to the artwork, dimensions or process may require replacement tools and a revised schedule. Before that point, changes can still need another file or proof review. Confirm the cost and approval before proceeding.
What should I check when the goods arrive?
Count packages, check the outside condition, compare representative goods with the approved reference, verify quantities and relevant functions, and retain evidence of any discrepancy. Follow the specific carrier and order reporting requirements; deadlines vary with the shipment and destination.
What changes on a repeat order?
Suitable retained tooling, files and approval records can reduce preparation. The new quote still confirms quantity, materials, price, tool condition, inspection and transport. A changed design or construction may reopen stages from the first order.
Explore options before requesting the final quotation
Specification tools can help you describe: pouches and doypacks, stickers and labels, jars and bottles, clothing, tote bags, pins and badges and business cards.
The available tools are grouped on the product specification tools page. Custom-shaped boxes, presentation cases and displays need a project quotation.
Send the six key details so we can prepare a quote and project schedule.
Product, quantity, dimensions, artwork status, deadline and address. After a complete brief we aim to respond within 48 working hours, confirming production, destination-specific transport and the approvals needed before your target date.
Delivery to the United Kingdom
Include your UK delivery postcode and required arrival date. Transport is quoted before payment, normally on DAP terms; import duties and import VAT payable at destination are separate. The quotation confirms the currency and agreed schedule.